Requests for Information / Design Issue Recommendation / Resolution

PH&C logs field questions, gets a design answer, and prices the cost and time before the crew changes the work.

A request for information, or RFI, is how a contractor asks the design team what the drawings mean. PH&C runs that log for the owner so questions are answered quickly and the cost of each answer is known before work changes.

What PH&C handles

  • Receiving, numbering, and dating every RFI.
  • Sending each question to the right designer and tracking the response time.
  • Reviewing responses for cost and schedule effect before they are implemented.
  • Separating design clarifications from changes in scope.
  • Identifying patterns, such as many RFIs on one specification section, and raising them with the design team.
  • Coordinating bulletins and revised drawings when an answer changes the documents.
  • Linking RFIs to change orders and to the pay application record.
  • Reporting open items to the owner.

What you get

  • A single log that shows each question, the response, and the outcome.
  • Decisions made before the field has to guess.
  • Fewer unplanned changes after work is in place.
  • A record that supports your position if a claim arises.