Opinions of Probable Cost / Project Budgeting
PH&C prepares an early cost opinion with site, building, and soft costs separated, so you can test the deal before design fees add up.
An opinion of probable cost is an early budget that states its assumptions. PH&C prepares it during feasibility, when the drawings are a sketch or a program, so you can decide whether the next dollar should be spent.
What PH&C handles
- Separating hard costs (site work, building, tenant work) from soft costs (design, permits, legal, insurance, financing, commissions).
- Pricing the drivers visible at this stage: earthwork, retaining walls, utilities, off-site road work, and remediation.
- Using current regional unit prices and noting where a price is a placeholder.
- Sizing contingency to the level of information available.
- Comparing the total against your pro forma and financing assumptions.
- Showing which line items would have to change for the deal to work.
- Updating the opinion as studies and drawings come in.
What you get
- A budget you can take to a lender or an investor.
- Visibility into the items that drive cost, rather than a single total.
- Alternatives when the numbers do not work, such as a smaller building, a different site, or a phased scope.
- A foundation for the detailed estimate that follows.
How it connects
As drawings advance, the opinion becomes a detailed estimate under estimating and value engineering and is tested in the pro forma and budget. It is part of site analysis and feasibility. If you have a sketch and a target return, contact PH&C.