Highway Access
PH&C checks highway access during feasibility: which agency owns the road, and what turn lanes, signals, or studies it may require.
Before an owner prices a pad or a building, someone has to determine how vehicles will enter and leave the site. PH&C does that during feasibility. We identify who controls the road, which permits apply, and what improvements the agency is likely to require.
What PH&C handles
- Determining whether the frontage is a state highway, a county road, or a local street.
- Identifying the permit path, such as a PennDOT highway occupancy permit, an NJDOT access permit, or a municipal driveway permit.
- Coordinating the traffic engineer on trip generation and access design.
- Meeting with agency staff before the plan is final.
- Estimating turn lanes, signals, widening, and drainage work.
- Testing the site layout against truck movements, queues, and circulation.
- Carrying the findings into the budget and the schedule.
What you get
- A short memo covering the permit path, the likely improvements, and a cost range for off-site work.
- An early read on whether the site can be accessed the way the plan assumes.
- A budget that includes road improvements, which are often among the largest site costs.
- A basis for deciding whether to buy the property.
How it connects
Once the project proceeds, the permits are managed under highway permitting. Access is one part of site analysis and feasibility.
Highway Access Examples
We’ve helped many clients with the extensive permitting process around roadway access.
Projects
33 projects